Final Technical Report

A final technical report is due within 90 days of the end date for most federal awards. The report length and content vary depending on sponsor. Such reports range from a brief summary and list of publications to a complete, exhaustive compilation of the project results.

The PI is responsible for the submission of all technical reports required under the terms of an award. The Department should be familiar with the sponsor form and required content. Best practices require that the PI or Department upload the submitted report to the GMAS Segment Repository.

Failure on the part of the PI to deliver any required technical reports or deliverables to the sponsor in a timely manner may affect the collection of funds for the project and future funding from that sponsor to the University.